On Monday, the framers were onsite to remove the walls that we demoed and install the beams that will replace the support needed for the second floor. When I got home from work they had the beams shored up so it didn't look that much different than when I left that morning.


Yesterday however, was a different story. They removed the shoring, and fabricated this slight arch at the beam. The room is now open all the way to the back . This picture was taken from the front door. You can't see if from here, but the window at the far end on the left was replaced.

The new window is a little longer than the original window. In the remodeled kitchen the sink will be below this window.

The back door is gone and in it's place is a new sliding door. The plumbers were also there yesterday installing the connections for the refridgerator and the washer and dryer.