Framing and drywall...

...but first delivery of the bathtub for the guest bathroom. Not quite sure why these things have to weigh so much! Luckily Merrill has lots of help!


Instructions for the drywall/tile installation.


The guest bathroom, tub set in place and barrel ceiling above the tub framed in. Master bath with similar barrel ceiling, pony wall and bench seat framed in. Piping for the two shower heads (on the left and right side) are installed also. A can light on the ceiling has also been installed. Drywall installed at the barrel ceiling in the guest bath. Drywall installed at barrel ceiling and pony wall of the master bathroom. The controls for the shower on the right have been raised and they had been installed too close to the bench seat. (see framing picture) Waterproofing tar has been installed on the bench seat and shower floor.